Time-Dependent Fuzzy Reliability Analysis of Concrete Slab during the Initial Water Storage Period of CFRD: A Case Study

Table 1

Parameters calibration results of Duncan and Chang’s E–B model.

MaterialKeKurmRfKbφ0 ()Δφ ()n

Cushion and transition1,3121,2830.350.62559.249.32.70.36
Upstream rockfill1,4861,6230.260.71419.846.730.31
Downstream rockfill1,0551,4890.320.68530.344.23.20.28