Research Article
Comparative Study of Swarm-Based Algorithms for Location-Allocation Optimization of Express Depots
Table 3
Average cost over 30 runs and standard deviate for PSO, DE, ABC, and LDES using RPK and TES encoding scheme.
| Encoding scheme | Average cost (standard deviation) | PSO | DE | ABC | LDES |
| RPK | 17.23 (0.74) | 15.95 (0.05) | 15.54 (0.4) | 15.96 (0.09) |
| TES | 21.71 (1.39) | 19.35 (0.61) | 17.53 (0.52) | 18.82 (0.52) |
| Improvement | 20.64% | 17.57% | 11.38% | 15.20% |
|
|