Forecasting of Energy Production for Photovoltaic Systems Based on ARIMA and ANN Advanced Models
Table 9
Main results of the energy production by the experimental PV park from Grojdibodu forecasted for the period 01-09.08.2013.
| Day | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| Hours when the inverter is running (solar W/m2) | 13.75 | 13.25 | 13 | 13 | 13 | 13.25 | 13 | 13 | 13 | Total | 26,565 | 25,599 | 25,116 | 25,116 | 25,116 | 25,599 | 25,116 | 25,116 | 25,116 | Total solar irradiance (Wh/m2) | 6,103.6 | 7,240.3 | 7,416.6 | 6,091 | 7,388.08 | 7,101.34 | 7,214.13 | 7,285.4 | 7,325.3 | Exported active energy (MWh) | 50.77 | 59.48 | 60.74 | 48.49 | 60.18 | 56.62 | 59 | 59.16 | 59.54 | PR (%) calculated in SCADA | 83.51 | 82.55 | 82.22 | 79.99 | 81.83 | 80.07 | 82.12 | 81.54 | 81.66 | Real availability (%) | 100 | 100 | 100 | 97.5 | 98.84 | 98.11 | 100 | 100 | 100 | Availability given by the manufacturer (%) | 100 | 100 | 100 | 97.5 | 98.84 | 100 | 100 | 100 | 100 | Events in which energy production is disrupted | — | — | — | Inverter off 6 hours | Inverter: motherboard damaged (replaced) | Inverter off 15 min | — | — | — | String hours with energy loss | — | — | — | 627.9 | 291.34 | 483.82 | — | — | — | Estimated energy losses (MWh) | — | — | — | 1.8 | 0.4 | 1.75 | — | — | — |
|
|