Research Article

Development of a Cost-Effective Solar/Diesel Independent Power Plant for a Remote Station

Table 6

HOMER simulation result showing optimization case with overall option.

ArchitectureCostSystemGen725
PV (kW)Gen725 (kW)FB
200ā€“800
Converter (kW)DispatchCOE ($)NPC ($)Operating cost ($)Initial capital ($)Ren Frac (%)Fuel (L)Hours

89.67253400CC1.1904,021,437208,5031,326,0150166,8712,919
7507253400CC1.2034,064,293145,4082,184,53510082,7342,919
0.47252400CC1.2124,095,415241,746970,2350214,6562,919
ā€‰7252400CC1.2124,096,615241,893969,5350214,8522,919
7507253400CC1.2194,119,949149,7132,184,5359188,4742,919
89.67253800CC1.2274,147,168208,5591,451,0150166,7342,919
7507253800LF1.2404,189,552145,4282,309,53510082,7342,919
0.47252800CC1.2494,220,674241,7661,095,2350214,6562,919