Development of a Cost-Effective Solar/Diesel Independent Power Plant for a Remote Station
Table 7
Comparison simulation of economic results between existing system and a hybrid system.
Parameter
Existing diesel-only system
Proposed hybrid (PV/Diesel) system
Value
Dollar ($)
Naira (#)
Dollar ($)
Naira (#)
Initial cost
1,574,535
314,907,000
2,184,535
436,907,000
Operating cost
416,895
83,379,000
145,408
29,081,600
Total NPC
6,963,954
1,392,790,800
4,064,293
812,858,600