Research Article

Numerical Simulation Study on the Development Effect of Gravity Fire Flooding by Vertical Well Sidetracking

Table 2

Value level of development engineering factors.

FactorGas injection rate (m3/d)Perforated position of injection wellThe length of sidetracking in vertical wells (m)

150001/330
2100002/340
315000150