Research Article
Numerical Study of Single Well Vapor Extraction Process
Table 2
Operation condition of early time scenarios.
| Case | Injection rate (CWE m3/day) | Description |
| Vapex | 2000 (m3/day) | Vapex from the beginning | SAGD | 300 | SAGD for 180 days, followed by Vapex | Cyclic 1x | 300 | 20 days of injection, 70 days of production, followed by Vapex | Cyclic 2x | 300 | 20 days of injection, 70 days of production for 2 times, followed by Vapex |
|
|
Hydrocarbon solvent injection rate.
|